Courtney Ave Sewer Rehabilitation Project
Project #: | 2024-WW05 (ITB) |
---|---|
Issued by: | Oak Lodge Water Services |
Publish Date: | Aug 19, 2025 12:00PM |
Bids Due Date: |
Sep 9, 2025 2:00PM
(Pacific Daylight Time)
|
Price Range: | $1,600,000 - $1,800,000 |
Status: | Open |
Description
The Courtney Ave Sewer Rehabilitation project generally consists of pipe bursting, cured-in-place pipe lining, and open trench construction for approximately 3,842 feet of sewer pipe within the Oak Lodge Water Services District, along Courtney Avenue from River Rd to McLoughlin Blvd. The work also includes replacement of manholes and laterals, along with surface restoration.
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
Item No | Item | Unit of Measure | Quantity | Cost | Required? |
---|---|---|---|---|---|
1 | Mobilization | LS | 1.00 |
![]() |
![]() |
2 | Temporary Work Zone Traffic Control, Complete | LS | 1.00 |
![]() |
![]() |
3 | Erosion Control | LS | 1.00 |
![]() |
![]() |
4 | Bypass Pumping | LS | 1.00 |
![]() |
![]() |
5 | Extra for Handling and Disposal of Asbestos Cement Sewer Pipe | LF | 110.00 |
![]() |
![]() |
6 | Construction Staking | LS | 1.00 |
![]() |
![]() |
7 | Removal of Curbs | LF | 76.00 |
![]() |
![]() |
8 | Removal of Walks and Driveways | SQFT | 330.00 |
![]() |
![]() |
9 | Removal of Surfacing | SQYD | 1080.00 |
![]() |
![]() |
10 | Removal of Manholes | EACH | 13.00 |
![]() |
![]() |
11 | Removal of Cleanouts | EACH | 1.00 |
![]() |
![]() |
12 | Mainline Video Inspection | FT | 3750.00 |
![]() |
![]() |
13 | Service Lateral Video Inspection | EACH | 44.00 |
![]() |
![]() |
14 | 8-Inch Sanitary Sewer Pipe Bursting | FT | 1240.00 |
![]() |
![]() |
15 | 8-Inch Sanitary Sewer CIPP | FT | 1121.00 |
![]() |
![]() |
16 | 10-Inch Sanitary Sewer CIPP | FT | 250.00 |
![]() |
![]() |
17 | 12-Inch Sanitary Sewer CIPP | FT | 464.00 |
![]() |
![]() |
18 | Spot Repair Prior to CIPP Liner | EACH | 2.00 |
![]() |
![]() |
19 | 8-Inch PVC D3034 Sanitary Sewer Pipe, 10 to 15-Feet | FT | 675.00 |
![]() |
![]() |
20 | Sanitary Sewer Lateral, Open Trench, 4-Inch | FT | 976.00 |
![]() |
![]() |
21 | Sanitary Sewer Lateral, Open Trench , 6-Inch | FT | 232.00 |
![]() |
![]() |
22 | Service Lateral Service Reconnection - Burst | EACH | 18.00 |
![]() |
![]() |
23 | Service Lateral Reconnection - CIPP | EACH | 15.00 |
![]() |
![]() |
24 | Service Lateral Reconnection - Open Trench | EACH | 2.00 |
![]() |
![]() |
25 | Cleanout, 4-Inch | EACH | 36.00 |
![]() |
![]() |
26 | Cleanout, 6-Inch | EACH | 8.00 |
![]() |
![]() |
27 | Standard 48-Inch Manhole, 10-Feet | EACH | 4.00 |
![]() |
![]() |
28 | Standard 48-Inch Manhole, 10 to 20-Feet | EACH | 10.00 |
![]() |
![]() |
29 | Connect to Existing Structure | EACH | 13.00 |
![]() |
![]() |
30 | Inside Drop of Existing Manhole | EACH | 1.00 |
![]() |
![]() |
31 | Rehabilitate Existing Manhole, Non-Structural Lining (as needed) | EACH | 2.00 |
![]() |
![]() |
32 | Rehabilitate Existing Manhole, Minor Rim Adjustment (as needed) | EACH | 2.00 |
![]() |
![]() |
33 | Rehabilitate Existing Manhole, Minor Grout Work (as needed) | EACH | 2.00 |
![]() |
![]() |
34 | Rehabilitate Existing Manhole, Replace Frame and Cover (as needed) | EACH | 2.00 |
![]() |
![]() |
35 | Asphalt Pavement Sawcutting | FT | 4950.00 |
![]() |
![]() |
36 | Asphalt Pavement Trench Resurfacing | SQYD | 980.00 |
![]() |
![]() |
37 | Restoration of Unpaved Ground Surface | LS | 1.00 |
![]() |
![]() |
38 | Concrete Curb | FT | 76.00 |
![]() |
![]() |
39 | Concrete Sidewalk | SQFT | 330.00 |
![]() |
![]() |
Attachments
This project has the following solicitation documents.
You will need to:
Be logged into Bid Locker
Be registered with Oak Lodge Water Services
Vendor Questions and Answers
Submitted Questions About This Bid
These are vendor questions for which the agency has supplied an answer.
Questions | |
---|---|
Are open frame diesel driven pumps acceptable for bypass work or do they need to be a critically silenced model? |
Asked Aug 25, 2025 8:32AM
|
Answer:
Open frame diesel pumps are acceptable for bypass work. |
|
2.2 Bid Item Descriptions, Items 15-17: Would you consider United Felts United UV GRP as an approved high-strength, continuous glass fiber UV CIPP lining solution for this project? Explore United UV GRP liners, crafted from continuous fiberglass for exceptional strength and durability. Perfect for large-scale sewer UV liner projects, these pre-impregnated liners streamline the UV curing process, enhance quality control, and reduce environmental impact. Ideal for tough, long length, large-diameter applications. United UV GRP liners conform to both ASTM F2019 and F1216. https://vortexinfrastructure-my.sharepoint.com/:f:/g/personal/ccalabro_vortexcompanies_com/Em-acRANkkFNgCJmXcGHUFkBz5xY3buLSp60Qf7SlR1V6A?e=dosjeC |
Asked Aug 27, 2025 12:27PM
|
Answer:
The Bid Item Descriptions for Items 15, 16 and 17 (pages 22, 23 & 24 in the ITB) refer to Oregon Standard Specifications for Construction (OSSC) Section 00413 for description, materials and construction requirements for the bid items. Item submittals that meet all the requirements would be approved for the project. |
|
Would you consider specifying and mandating the use of VeriCure for temperature monitoring of the CIPP lining as part of the QA/QC process? VeriCure software is tailored for CIPP installation professionals. Real-time data viewing allows you to monitor and control the cure for maximum quality and efficiency along the entire length of the pip. VeriCure software also ensures that the entire length of the liner has met and maintained the proper cure temperature according to the manufacture’s guidelines, while also monitoring cool down. The final data is summarized in a gradient chart to show temperature change over time. Attached is our VeriCure submittal flyer, in which pages 6-14 provide a full product overview. Specifying VeriCure will ensure monitoring throughout the entire line to ensure a proper cure according to the manufacturer in lieu of an undefined number of temperature gauges. We hope you will consider this technology and are available to answer any questions. https://vortexinfrastructure-my.sharepoint.com/:f:/g/personal/ccalabro_vortexcompanies_com/EqdgMVa3FsBNi49uVIZ58hoBiHpFdZ-z2kkMxrFfm2dqLQ?e=IH7NIS |
Asked Aug 27, 2025 12:28PM
|
Answer:
The Item Bid descriptions refer to the applicable sections of the Oregon Standard Specifications for Construction (OSSC). Any item submittal that meets the required specifications would be accepted for the project. |
For Questions or Additional Information, Contact:
Name: Oak Lodge Water Services
Email: procurement@olws.org
Planholders
Planholders
These are the vendors who have downloaded the solicitation documents:
Business | When |
---|---|
B&G EXCAVATION AND PLUMBING LLC | Aug 22, 2025 |
Braun Construction & Design, LLC |
Aug 21, 2025
(prime)
|
ConstructConnect | Aug 21, 2025 |
DJC Oregon Project Center | Aug 20, 2025 |
Emery & Sons Construction Group, LLC | Aug 20, 2025 |
Eugene Builders Exchange | Aug 20, 2025 |
Insituform Technologies, LLC |
Aug 21, 2025
(sub)
|
Ironmark, LLC | Aug 21, 2025 |
Kerr Contractors Oregon, LLC | Aug 20, 2025 |
Landis & Landis Construction, LLC |
Aug 25, 2025
(prime)
|
Moore Excavation Inc. |
Aug 25, 2025
(prime)
|
Plan Center Northwest |
Aug 20, 2025
(plan center)
|
Premier Builders Exchange |
Aug 26, 2025
(plan center)
|
ROGER LANGELIERS CONSTRUCTION |
Aug 22, 2025
(sub)
|
Rotschy, LLC. |
Aug 21, 2025
(prime)
|
Salem Contractors Exchange | Aug 20, 2025 |
Seattle Daily Journal of Commerce |
Aug 20, 2025
(plan center)
|
The Saunders Company | Aug 20, 2025 |
Vortex Services, LLC. | Aug 27, 2025 |
Willamette Fence Co., Inc. | Aug 20, 2025 |
About Oak Lodge Water Services
Oak Lodge Water Services (OLWS) provides drinking water, wastewater, and watershed protection services to approximately 29,000 residents and businesses in Oak Grove, Jennings Lodge, and parts of Milwaukie and Gladstone.
Our system includes 208 miles of drinking water and wastewater pipes, 3,123 catch basins, and 773 fire hydrants. Additionally, we operate a wastewater treatment plant that processes over 1.5 billion gallons of wastewater each year.